Commit Graph

27 Commits

Author SHA1 Message Date
Donald Sharp
266b061994 zebra: Properly note that a nhg's nexthop has gone down
Current code when a link is set down is to just mark the
nexthop group as not properly setup.  Leaving situations
where when an interface goes down and show output is
entered we see incorrect state.  This is true for anything
that would be checking those flags at that point in time.

Modify the interface down nexthop group code to notice the
nexthops appropriately ( and I mean set the appropriate flags )
and to allow a `show ip route` command to actually display
what is going on with the nexthops.

eva# show ip route 1.0.0.0
Routing entry for 1.0.0.0/32
  Known via "sharp", distance 150, metric 0, best
  Last update 00:00:06 ago
  * 192.168.44.33, via dummy1, weight 1
  * 192.168.45.33, via dummy2, weight 1

sharpd@eva:~/frr1$ sudo ip link set dummy2 down

eva# show ip route 1.0.0.0
Routing entry for 1.0.0.0/32
  Known via "sharp", distance 150, metric 0, best
  Last update 00:00:12 ago
  * 192.168.44.33, via dummy1, weight 1
    192.168.45.33, via dummy2 inactive, weight 1

Notice now that the 1.0.0.0/32 route now correctly
displays the route for the nexthop group entry.

Signed-off-by: Donald Sharp <sharpd@nvidia.com>
2024-07-03 09:34:55 -04:00
Y Bharath
8381dbd9e2 tests: Avoid importing unused modules
Signed-off-by: y-bharath14 <y.bharath@samsung.com>
2024-06-17 15:42:59 +05:30
Renato Westphal
dc354cbfef tests: introduce method to update reference data in isis_tilfa_topo1
The isis_tilfa_topo1 topotest is comprehensive and contains a large
amount of reference data. One problem is that, when changes occur,
updating this reference data can be difficult.

To address this problem, this commit introduces a method to
automatically regenerate the reference data by setting the `REGEN_DATA`
environment variable.

Usage:
$ REGEN_DATA=true python3 ./test_isis_tilfa_topo1.py

When `REGEN_DATA` is set, the topotest regenerates reference data
from the current run instead of comparing against existing reference
data. Note that regenerated data must be manually verified for
correctness.

This commit also simplifies the reference data by replacing all diff
files with complete JSON snapshots.

Signed-off-by: Renato Westphal <renato@opensourcerouting.org>
2024-06-10 12:28:01 -03:00
Renato Westphal
04655c5f74 tests: rework isis_tilfa_topo1 to fix timing issues
In this topotest, steps 10-15 were added to test the IS-IS switchover
functionality. In short, two cases were tested: switchover after a
link down event and switchover after a BFD down event. Both cases
were tested in sequence on the same router, rt6. This involved the
following steps:
- Setting the SPF delay timer to 15 seconds
- Shutting down the eth-rt5 interface from the switch side
- Testing the post-switchover RIB and LIB (triggered by the link down
  event)
- Testing the post-SPF RIB and LIB
- Bringing the eth-rt5 interface back up
- Configuring a BFD session between rt6 and rt5
- Shutting down the eth-rt5 interface from the switch side once again
- Testing the post-switchover RIB and LIB (triggered by the BFD down
  event)
- Testing the post-SPF RIB and LIB

Since the time window to test the post-switchover RIB and LIB was too
narrow (10 seconds), these tests were having sporadic failures.

To resolve this problem, we can simplify the switchover test as follows:
- Setting the SPF delay timer to 60 seconds (not 15)
- Disabling "link-detect" on rt6's eth-rt5 interface
- Shutting down the eth-rt5 interface from the switch side
- On rt6, testing the post-switchover RIB and LIB (triggered by the
  BFD down event)
- On rt5, testing the post-switchover RIB and LIB (triggered by the
  link down event)

Notice how we can test both post-link-down and post-BFD-down switchover
cases simultaneously by having different "link-detect" configurations
on rt5 and rt6. Additionally, by using a larger SPF delay timer, the
time window to test the post-switchover RIB and LIB is much larger
and less prone to sporadic failures.

Signed-off-by: Renato Westphal <renato@opensourcerouting.org>
2024-06-10 12:28:01 -03:00
Donatas Abraitis
27330655f3
Merge pull request #14112 from donaldsharp/test_sponging
Test sponging
2023-07-31 10:02:36 +03:00
Donald Sharp
15bf9baa98 tests: Convert isis to use 1 and 10 for hello/multiplier
Current isis tests use a variety of hello timers as well
as hello-multiplier, let's modify all of the isis test
cases to use 1 and 10.  This cleans up some spurious test
failures I was seeing locally.  As an example without
these changes running isis_tilfa_topo1 2r6 times I would
see 5-10 test failures now I am seeing ~2 test failures.

In any event part of the problem was that some tests were
not fully converged when looking at them under heavy
system load.  Changing this to 1/10 gives us 10 chances
to see the incoming packet.

Signed-off-by: Donald Sharp <sharpd@nvidia.com>
2023-07-29 13:39:37 -04:00
Renato Westphal
2dd4cad60b tests: increase wait timer in TI-LFA topotest
Starting from step 11, this topotest focuses on validating the TI-LFA
switchover functionality, where the backup nexthops are activated
after an adjacency expires, either with or without BFD.

Currently, the test checks the RIB shortly after the switchover using
a tight 5 seconds interval to ensure that the RIB update is due to the
switchover and not an SPF update (which is configured with an initial
delay of 15 seconds). However, it was observed that the kernel might
take longer than 5 seconds to install routes when the system is under
heavy load. To account for that, double the wait interval so that
this topotest will succeed even in those conditions.

Signed-off-by: Renato Westphal <renato@opensourcerouting.org>
2023-07-29 14:18:39 -03:00
Renato Westphal
174a3d1b6e tests: ensure BFD session is up before proceeding to the next step
In this topotest, BFD is configured at the end of step 13. However,
in certain cases where the testing machine is exceptionally fast (e.g.,
Donald's quantum computer), there is a possibility that the interface
shutdown event from step 14 may occur before BFD has had sufficient
time to establish the session, which leads to a test failure. To fix
this problem, ensure the BFD session is up before proceeding to the
next step.

Signed-off-by: Renato Westphal <renato@opensourcerouting.org>
2023-07-29 14:18:39 -03:00
Renato Westphal
824b1d299a tests: increase hello multiplier in TI-LFA topotest
In this topotest, the IS-IS hello interval is set to 1 for fast
convergence. However, the current hello multiplier of 3 results in a
tight IS-IS adjacency holdtime of 3 seconds. This tight timeframe can
cause failures when the testing machine is running multiple tests at
full capacity. To improve stability under such conditions, this commit
raises the hello multiplier to 10, providing a more forgiving holdtime
and reducing the likelihood of failures.

Signed-off-by: Renato Westphal <renato@opensourcerouting.org>
2023-07-29 14:10:31 -03:00
Donald Sharp
f5c44adb73 tests: isis_tilfa_topo1 fails sometimes due to insufficient time
The isis_tilfa_topo1 test is failing because insufficient time was
given for isis to converge on the system under system load.  Extend
the time and decrease the hello-interval timers to give it more
of a chance to converge.

Signed-off-by: Donald Sharp <sharpd@nvidia.com>
2023-07-10 09:06:40 -04:00
David Lamparter
acddc0ed3c *: auto-convert to SPDX License IDs
Done with a combination of regex'ing and banging my head against a wall.

Signed-off-by: David Lamparter <equinox@opensourcerouting.org>
2023-02-09 14:09:11 +01:00
Donatas Abraitis
d3a6af081e tests: Set minimum wait time for tests to 5 seconds
Signed-off-by: Donatas Abraitis <donatas@opensourcerouting.org>
2022-11-22 13:38:10 +02:00
Donald Sharp
c6653ab2eb tests: Expand minimum run_and_expect to 5 seconds
Ensure that the minimum time spent run and expecting is
5 seconds.  Heavy load is not a reason to fail a test.

Signed-off-by: Donald Sharp <sharpd@nvidia.com>
2022-11-21 19:42:18 -05:00
Louis Scalbert
3a03bf9f50 topotests: isis-lfa add a switchover test after neighbor clear
Add a switchover test that consists in clearing the rt2 neighbor on rt1.

Check that the switchover between primary and backup happens before the
SPF re-computation.

Signed-off-by: Louis Scalbert <louis.scalbert@6wind.com>
2022-10-24 14:56:42 +02:00
Louis Scalbert
2a9f5928fe topotests: isis-tilfa add a switchover test after BFD down
Add a switchover test that consists in:
- Setting up ISIS BFD between rt5 and rt6
- Setting no link-detect on rt6 eth-rt5 so that zebra does not take
  account linkdown events on this interface.
- Shutting down rt6 eth-rt5 from the switch side

Check that the switchover between primary and backup happens before the
SPF re-computation.

Signed-off-by: Louis Scalbert <louis.scalbert@6wind.com>
2022-10-24 14:56:42 +02:00
Louis Scalbert
f3529a5522 topotests: isis-tilfa add a switchover test after linkdown
Add a switchover test that consists in shutting down an interface.

Check that the switchover between primary and backup happens before the
SPF re-computation.

Signed-off-by: Louis Scalbert <louis.scalbert@6wind.com>
2022-10-24 11:50:13 +02:00
Donatas Abraitis
790b48b635 Revert "topotests: isis-tilfa add a switchover test after linkdown"
This reverts commit bac0d1e606.
2022-07-10 21:40:55 +03:00
Donatas Abraitis
bbd3d821dd Revert "topotests: isis-tilfa add a switchover test after BFD down"
This reverts commit e83a52698b.
2022-07-10 21:40:49 +03:00
Russ White
36153aa328
Merge pull request #10962 from louis-6wind/lfa-netlink
isisd: apply fast-reroute as soon an interface or an adjacency falls down
2022-07-08 11:14:07 -04:00
Olivier Dugeon
7700a88aa5 isisd: Stop fulfill MPLS table when SR is disabled
When Segment Routing is disabled, if isisd received LSP with Segment Routing
information, in particular prefix SIDs, it installs corresponding MPLS entries
while it should not as SR is disabled.

This patch adds extra control to verify if SR is enabled or not before
configuring MPLS LFIB & IP FIB with prefix SIDs and adjust SR & TI-LFA
tests accordingly.

Signed-off-by: Olivier Dugeon <olivier.dugeon@orange.com>
2022-05-25 17:29:21 +02:00
Louis Scalbert
e83a52698b topotests: isis-tilfa add a switchover test after BFD down
Add a switchover test that consists in:
- Setting up ISIS BFD between rt5 and rt6
- Setting no link-detect on rt6 eth-rt5 so that zebra does not take
  account linkdown events on this interface.
- Shutting down rt6 eth-rt5 from the switch side

Check that the switchover between primary and backup happens before the
SPF re-computation.

Signed-off-by: Louis Scalbert <louis.scalbert@6wind.com>
2022-05-24 10:06:05 +02:00
Louis Scalbert
bac0d1e606 topotests: isis-tilfa add a switchover test after linkdown
Add a switchover test that consists in shutting down an interface.

Check that the switchover between primary and backup happens before the
SPF re-computation.

Signed-off-by: Louis Scalbert <louis.scalbert@6wind.com>
2022-05-24 10:06:05 +02:00
Donald Sharp
949aaea5ba tests: Remove debugs from topotests
Debugs take up a significant amount of cpu time as well as
increased disk space for storage of results. Reduce test
over head by removing the debugs, Hopefully this helps
alleviate some of the overloading that we are seeing in
our CI systems.

Signed-off-by: Donald Sharp <sharpd@nvidia.com>
2021-11-07 07:45:27 -05:00
Christian Hopps
4953ca977f tests: cleanup - remove unused imports
Signed-off-by: Christian Hopps <chopps@labn.net>
2021-09-04 09:04:47 -04:00
Christian Hopps
e82b531df9 tests: remove legacy Topo class (fixes many pylint errors)
Signed-off-by: Christian Hopps <chopps@labn.net>
2021-09-04 09:04:46 -04:00
Christian Hopps
8db751b853 tests: micronet: adapt tests
Signed-off-by: Christian Hopps <chopps@labn.net>
2021-09-04 09:04:46 -04:00
Donatas Abraitis
764b81858f tests: Unify directory naming for topotests
Change every `-` to `_` in directory names. This is to avoid mixing _ and -.

Just for consistency and directory sorting properly.

Signed-off-by: Donatas Abraitis <donatas.abraitis@gmail.com>
2021-05-11 14:14:26 +03:00